Ember move postponed by a week

Posted: September 10, 2013

Event date: September 24, 2013

The Ember cluster and its Ibrix scratches move to the Downtown Data Center and OS upgrade have been postponed to start on September 24th at 8:00am at the request of a major user group.

The reservation to empty Ember queue will be updated to reflect this date change.

Users that use/mount these /scratch/ibrix file spaces from other locations (other clusters or desktops) please make sure you have any data you need moved off of these two file systems before this time.

For owner Ember nodes, both compute and interactive: Note that any data on the local hard drives (/scratch/local) will be lost in this process. If you have any data in this location, you need to move it elsewhere before 8:00am Sept 24. If you need any assistance, please submit a request to issues@chpc.utah.edu.